Skip to main content

Project Development and Results

Results

The outcome of this project must be a fully functional functional  pneumatic elevator that can be installed on a SeaPod. The results must include the following:

  • Design document
  • Wiring diagram
  • User manual
  • Safety manual

 

 

Documenting Recommendations

A detailed report of the recommendation must accompany the results. The recommendation must specify the following:

  • Materials and components used to build the pneumatic elevator
  • A comparison of different turbines and their suitability for different payloads
  • Control brakes and switch panel details