Results and Recommendations
Documenting Results
The outcomes of this project must be a fully functional wasteincinerator watertoilet treatment plant.system. The system must accompany the following documents:
- System design guide
- System Installation guide
- User
guide Sludge collection and disposalguide
Testing the Electrocoagulation System
Pass DC power to the electrocoagulation system at different intervals of time of 4, 8 and 12 hours. At each time interval, measure the amount of sludge that is recovered from the sludge tanks and test the final water for TSS.
Publishing Recommendations
A detailed report of the recommendation must accompany the results. The recommendations must specify the following:
- Quantity of
potablewaste water recovered in the output chamber - Quantity of
sludgeburnt waste recovered fromsludgethetraysincinerator Ideal voltage to be applied for maximum efficiencyPrecautions on handling components, battery, chemicals, charging stations and testing and measuring equipmentchamber